Works are progressing well on the new Crossrail Custom House station. The structure of the new Crossrail Custom House station has been completed.

825 precast concrete components were installed using a purpose built 35 tonne gantry crane.

These large sections of the station were manufactured off site at Crossrail contractor Laing O’Rourke’s factory near Sheffield and then transported to east London where it was assembled on site.

This has ensured safer construction whilst helping to minimise disruption to local residents, local rail services and events at the ExCeL London.

Click on the details below to find out about current construction works at Abbey Wood.


Current Works

Custom House station

(View on map)

Description of work:

Permanent rail tracks will be installed along the rail corridor. The first phase includes the installation of switches and crossings at either end of the station