Current works at Liverpool Street Station

Current works at Liverpool Street Station

Liverpool Street station is undergoing major redevelopment to increase capacity, improve accessibility and upgrade interchanges as part of the building of Crossrail.

Click on the details below to find out about current construction works at Liverpool Street.

BROADGATE TICKET HALL

Crossrail is building a new ticket hall entrance under Liverpool Street which will link into the existing London Underground ticket hall.

The station box has been excavated to its final depth of 23 metres below ground level and the pre-cast roof is currently being installed. Works to construct the Access Passage linking the ticket hall to the London Underground Station – which required the temporary closure of the bus station - are now complete.  Works to connect the ticket hall to the platform tunnels are currently underway.

BLOMFIELD SHAFT WORKSITE

A 40m-deep shaft is being constructed on Blomfield Street to accommodate ventilation, electrical, mechanical and systems equipment for the new Crossrail station.

The Blomfield ventilation shaft has reached its final height of five storeys above ground level and is now structurally complete. Mechanical and electrical fit out is underway, to get the structure ready for handover to the railway systems fit out team this summer.

FINSBURY CIRCUS WORKSITE

A temporary 42m deep shaft has been built beneath Finsbury Circus Gardens to provide access for construction of the Liverpool Street station tunnels that link the new eastern and western ticket halls at Moorgate and Liverpool Street.

The two platform tunnels have been completed and handed over to the station works contractor who is now installing the platforms in pre-cast segments, and the platform edge screens.  The tunnels contractor continues to excavate the escalator tunnels and access passages linking the platforms to the east and west ticket halls.

MOORGATE TICKET HALL

The western ticket hall for the new Crossrail Liverpool Street Station will be created by enlarging the existing Moorgate London Underground Ticket Hall in Moorfields. 

All the demolition works at Moorgate are complete and good progress is being made on the construction of the new ticket hall, with roof installation now complete.  Works to fit out the Moorgate shaft are due to commence in the summer.


Current Works

Moorgate ticket hall

(View on map)

Description of work:

We will be closing the southbound lane of Moorgate between Ropemaker Street and London Wall from 23 July until the end of March 2017 to facilitate deliveries for the fit out of the Moorgate shaft and ticket hall.

Details of work as PDF:

Moorgate ticket hall

(View on map)

Description of work:

In Fore Street, we will be installing a new temporary route through the Crossrail site to the westbound Metropolitan, Circle and Hammersmith and City line platforms. This is in order to hand back part of the site we have used for temporary access to Land Securities, the developer of 21 Moorfields. There is no change, at this time, to the other entrance on Moorfields.

Details of work as PDF:

Moorgate ticket hall

(View on map)

Description of work:

We will be working extended hours to fit out the Moorgate shaft, commencing on 1 August 2016. Works will initially be at the base of the shaft and we do not expect these to be noisy.

Details of work as PDF:

Finsbury Circus access shaft

(View on map)

Description of work:

In the Liverpool Street station platform tunnels, the secondary lining and fireproofing works are now complete. Our main station works contractor, Laing O’Rourke, is now getting ready to start installing the station platforms. We are using pre-cast platforms to speed up the construction process. We will be adhering to core working hours during the platform installation.

Details of work as PDF:

Blomfield Street shaft

(View on map)

Description of work:

From 25 June to the end of October it will be necessary to narrow a section of Blomfield Street adjacent to the Crossrail Liverpool Street worksite in order to maintain access for deliveries. The adjacent loading bays will be suspended.

Details of work as PDF:

Broadgate ticket hall

(View on map)

Description of work:

As part of the works for the new Crossrail Liverpool Street station we are building a new ticket hall entrance on Liverpool Street.

Details of work as PDF:

Broadgate ticket hall

(View on map)

Description of work:

Liverpool Street - section of road closed until 2018, from June 18 2011

Details of work as PDF:


10% Capacity Increase

Crossrail will increase central London rail transport capacity by 10 per cent