Crossrail will undertake the control measures as set out in the Crossrail Construction Code (Annex 1 to the Environmental Minimum Requirements) to ensure that the land does not pose an unacceptable risk to human health or the wider environment.
Pre-Construction
A programme of site investigations and chemical testing is being implemented in line with current guidance and best practice to identify and investigate potentially contaminated sites. The results of the site investigations are used to determine the nature and extent of any contamination, and will aid the development of appropriate risk reduction measures.
Mitigation
Where remedial works are considered necessary, treatment strategies will be incorporated into the design and construction programme to ensure that remediation is undertaken.