The train service will be delivered by a fleet of approximately 600 vehicles formed into 10 vehicle trains.
Crossrail rolling stock will be designed with overhead longitudinal luggage racks mounted each side of the vehicles that run the full length of the seated areas. There will also be luggage stacks close to the doors for use as suitcase storage.
The Crossrail project represents a challenging and yet exciting opportunity for global suppliers of trains, which together with other major UK railway projects will lead the way forward for new Electric Trains for the future.
