Crossrail Bill Supporting Documents

The Crossrail Bill became an Act of Parliament in July 2008. The parliamentary process required much documentation, all of which can be found here.
Use this resource to access detailed information about the Crossrail Bill and the various supporting documents which have been produced.
Accessing the documentation
The library folders below contain all of the Crossrail Bill documents. You can also use the navigation to the right to access detailed information about Crossrail, The Environmental Statement (ES) and the Plans and Sections deposited with the Bill.
Some of these files are large in size and may take some time to download.
Library
A01 Development of the Crossrail Route
Download document
Basic information
A03 Capacity on the Great Western Main Line
Download document
Basic information
A04 Ventilation and Intervention Shafts
Download document
Basic information
A05 Abbey Wood to Ebbsfleet
Download document
Basic information
A06 Selection of Western Termini
Download document
Basic information
A07 Selection of the North Eastern terminus
Download document
Basic information
A08 Remote Locations Key Plan
Download document
Basic information
A08 Update on the Crossrail Project and Guide to the ES
Download document
Basic information
B01 Disapplication of Legislation
Download document
Basic information
B03 Compliance with Undertakings and Assurances
Download document
Basic information
B04 Acquisition of Land Outside the Limits of Deviation
Download document
Basic information
B05 Main Provisions of the Planning Regime
Download document
Basic information
B07 Bill as Amended in Select Committee in the House of Commons
Download document
Basic information
B08 Compliance with the EIA Directive and ECHR
Download document
Basic information
C01 Information for Property Owners
Download document
Basic information
C02 Operation of the National Compensation Code
Download document
Basic information
C05 Additional Safeguarding
Download document
Basic information
C06 Recovery of Costs by Property Owners
Download document
Basic information
C07 Access to Residential and Commercial Property during Construction
Download document
Basic information
C08 Purchase of Property in Cases of Hardship
Download document
Basic information
C09 Land Acquisition Policy
Download document
Basic information
C11 Claims for Compensation for Intensification of Use
Download document
Basic information
D01 Crossrail Construction Code
Download document
Basic information
D02 Control of Environmental Impacts
Download document
Basic information
D03 Excavated Material and Waste Management Strategy
Download document
Basic information
D04 Treatment of Contaminated Land
Download document
Basic information
D07 Maintenance of Public Utilities
Download document
Basic information
D08 Tunnel Construction Methodology
Download document
Basic information
D09 Noise and Vibration Mitigation Scheme
Download document
Basic information
D10 Groundborne Noise and Vibration
Download document
Basic information
D13 Restitution of Open Space
Download document
Basic information
D15 Implementation and Staging
Download document
Basic information
D18 Listed Buildings and Conservation Areas
Download document
Basic information
D19 Highways and Traffic during Construction - Legislative Provisions
Download document
Basic information
D20 Traffic Management During Construction
Download document
Basic information
D21 Access for People with Reduced Mobility During Construction
Download document
Basic information
D23 Sprayed Concrete Lining
Download document
Basic information
D24 Tunnelling Duration and Construction Strategy
Download document
Basic information
D25 Noise from Fixed Installations
Download document
Basic information
D26 Surface Railway Noise and Vibration
Download document
Basic information
E02 Cycle Carriage and Cycle Parking
Download document
Basic information
E04 Public Safety, Security and Crime Prevention
Download document
Basic information
E05 Provisions for People with Reduced Mobility
Download document
Basic information
F02 Pre-Bill Consultation Process
Download document
Basic information
F05 Complaints Commissioner
Download document
Basic information
G02 Heathrow Access and Stockley Flyover
Download document
Basic information
G04 Tottenham Court Road - 94 Dean Street
Download document
Basic information
G05 Revised Depot and Stabling Strategy
Download document
Basic information
G06 London 2012 Olympic Games and Crossrail
Download document
Basic information
H03 Crossrail Access Option
Download document
Basic information
H04 Railway Powers in the Crossrail Bill
Download document
Basic information
D26 Surface Railway Noise and Vibration
Download document