Information Papers
Here are the Crossrail information papers initially presented to the House of Commons Select Committee considering the Crossrail Bill in January 2006.
Most of the papers were revised as the Bill continued it passage through Parliament - the version number and date is shown on the foot of the first page of the Paper.
Information Papers D9 and D26 are accompanied by Technical Notes, copies of which can be made available on request.
For a list of the commitments contained in the papers, please see the Register of Undertakings and Assurances.
- A01 Development of the Crossrail Route
- A02 Service Pattern
- A03 Capacity on the Great Western Main Line
- A04 Ventilation and Intervention Shafts
- A05 Abbey Wood to Ebbsfleet
- A06 Selection of Western Termini
- A07 Selection of the North Eastern terminus
- A08 Central Key Plan
- A08 North Eastern Key Plan
- A08 Remote Locations Key Plan
- A08 South Eastern Key Plan
- A08 Update on the Crossrail Project and Guide to the ES
- A08 Western Key Plan
- B01 Disapplication of Legislation
- B02 Limits of Deviation
- B03 Compliance with Undertakings and Assurances
- B04 Acquisition of Land Outside the Limits of Deviation
- B05 Main Provisions of the Planning Regime
- B06 Time Limits
- B07 Bill as Amended in Select Committee in the House of Commons
- B08 Compliance with the EIA Directive and ECHR
- C01 Information for Property Owners
- C02 Operation of the National Compensation Code
- C04 Small Claims Scheme
- C05 Additional Safeguarding
- C06 Recovery of Costs by Property Owners
- C07 Access to Residential and Commercial Property during Construction
- C08 Purchase of Property in Cases of Hardship
- C09 Land Acquisition Policy
- C10 Land Disposal Policy
- C11 Claims for Compensation for Intensification of Use
- D01 Crossrail Construction Code
- D02 Control of Environmental Impacts
- D03 Excavated Material and Waste Management Strategy
- D04 Treatment of Contaminated Land
- D05 Site Reinstatement
- D06 Construction Traffic
- D07 Maintenance of Public Utilities
- D08 Tunnel Construction Methodology
- D09 Noise and Vibration Mitigation Scheme
- D10 Groundborne Noise and Vibration
- D11 24-Hour Working
- D12 Ground Settlement
- D13 Restitution of Open Space
- D14 Worksite Security
- D15 Implementation and Staging
- D16 Use of Local Labour
- D17 Ecological Impacts
- D18 Listed Buildings and Conservation Areas
- D19 Highways and Traffic during Construction - Legislative Provisions
- D20 Traffic Management During Construction
- D21 Access for People with Reduced Mobility During Construction
- D22 Archaeology
- D23 Sprayed Concrete Lining
- D24 Tunnelling Duration and Construction Strategy
- D25 Noise from Fixed Installations
- D26 Surface Railway Noise and Vibration
- E01 Passenger Car Parking
- E02 Cycle Carriage and Cycle Parking
- E03 Retail Space
- E04 Public Safety, Security and Crime Prevention
- E05 Provisions for People with Reduced Mobility
- E06 Freight Operations
- F01 Inclusivity
- F02 Pre-Bill Consultation Process
- F03 Community Relations
- F04 High Level Forum
- F05 Complaints Commissioner
- G02 Heathrow Access and Stockley Flyover
- G03 Hanbury Street
- G04 Tottenham Court Road - 94 Dean Street
- G05 Revised Depot and Stabling Strategy
- G06 London 2012 Olympic Games and Crossrail
- H01 Timetabling and Growth
- H02 Railway Compensation
- H03 Crossrail Access Option
- H04 Railway Powers in the Crossrail Bill